Contaminación de Aire y Ruido Michael McCawley, PhD Dept. of Occupational and Environmental Health Sciences West Virginia University March 2, 2016 RESUMEN • Metodos de Monitoréo • Reglas • Emisiones - Polvo (PM10 – PM2.5) - Gases - Ruido • Estrategia de Muestréo Metodos de Monitoréo ESTACION DE MONITOREO INALAMBRICA SAMPLING PORT •Bajo costo •Con celdas solares •Opera 24 horas/día •Instalación Facil •Capacidad Remota LUZ SOLAR PANELS RUIDO POLVO HIDROCARBUROS 100 90 70 Muestreo de Aire PM10 PM2.5 80 LUNGS % 60 50 40 30 20 10 0 0.10 1.00 2.5 10.00 Diametro (µm) 100.00 Reglas Pollutant Primary/ Averaging Level Secondary Time Carbon Monoxide Lead Nitrogen Dioxide Ozone Particle Pollution PM2.5 PM10 Sulfur Dioxide 8-hour 9 ppm 1-hour 35 ppm primary and secondary Rolling 3 month average 0.15 μg/m3 primary 1-hour 100 ppb primary and secondary Annual primary and secondary primary Form Not to be exceeded more than once per year Not to be exceeded 98th percentile, averaged over 3 years 53 ppb Annual Mean 8-hour 0.075 ppm Annual fourth-highest daily maximum 8-hr concentration, averaged over 3 years primary secondary primary and secondary primary and secondary Annual Annual 12 μg/m3 15 μg/m3 annual mean, averaged over 3 years annual mean, averaged over 3 years 24-hour 35 μg/m3 98th percentile, averaged over 3 years 24-hour 150 μg/m3 primary 1-hour 75 ppb Not to be exceeded more than once per year on average over 3 years 99th percentile of 1-hour daily maximum concentrations, averaged over 3 years secondary 3-hour 0.5 ppm Not to be exceeded more than once per year Emisiones DOE TRAILER D C DOE TRAILER A Meteorología Topograpía INVERSION Source: Environ Health Perspect 118:847-855 (2010). 25 Producción Inicial 20 15 10 5 0 Preparación de la Localidad 20 15 10 5 0 0 1 2 3 4 TIME (days) 20 5 6 7 0 Perforación Vertical 18 PM2.5 Concentration (ug/m3) PM2.5 Concentration (ug/m3) PM2.5 Concentration (ug/m3) PM2.5 Concentration (ug/m3) 25 16 14 12 10 8 6 4 2 0 0 5 PM2.5 10 TIME (days) 15 20 1 2 18 16 14 12 10 8 6 4 2 0 3 4 TIME (days) 5 6 7 Fracking 0 1 2 3 Time (Days) 4 5 250 200 150 100 50 WELL PAD 300 11/6/2015 0:00 11/5/2015 0:00 11/4/2015 0:00 11/3/2015 0:00 FECHA 11/2/2015 0:00 11/1/2015 0:00 10/31/2015 0:00 10/30/2015 0:00 10/29/2015 0:00 10/28/2015 0:00 0 PM2.5 CONCENTRACION DE POLVO (ug/m3) PM2.5 250 200 150 100 50 PM2.5 DUST CONCENTRATION(ug/m3) PM2.5 WELL PAD CLOSE IN (water plant) 1 KM 300 0 11/6/2015 0:00 11/5/2015 0:00 11/4/2015 0:00 11/3/2015 0:00 11/2/2015 0:00 11/1/2015 0:00 10/31/2015 0:00 10/30/2015 0:00 10/29/2015 0:00 10/28/2015 0:00 FECHA Hydraulic Fracturing /Flowback1 Flowback Vertical Drill1 Hydraulic Fracturing Vertical Drill2 /Flowback2 Horizontal Drill VOC’s CHRONIC MRL HAZARD QUOTIENTS site 4 4 4 3 3 3 3 5 5 5 RESUL TS ppb(v) 1.1 1.0 0.78 3.0 2.4 2.4 2.1 85 49 12 8.2 4.5 4.2 3.9 2.9 1.7 13 3.0 2.2 2.1 1.7 26 14 13 12 9.2 5.6 41 9.5 7.0 6.8 5.3 2.7 Benzene 1.5 Benzene 1.4 Benzene 1.3 Benzene 1.0 Benzene DONNA 2 2 2 2 2 2 7 7 1 1 1 LEMON (Vertical Drill) 6 15 48 Pad Lewis Wetzel Three Lewis Wetzel Three Lewis Wetzel Three Lewis Wetzel Two Lewis Wetzel Two Frasco Summa– Promedio de 3 días Metodo EPA TO 15 (Rpt. limite 0.5ppb Benzene) @ 625 pies Lewis Wetzel Two Lewis Wetzel Two MAURY (Fracking) MAURY (Fracking) MAURY (Fracking) WEEKLEY (Fracking) WEEKLEY WEEKLEY WEEKLEY WEEKLEY WVDNR WEEKLEY (Horizontal Drill) WVDNR DONNA DONNA RESULT Hazard S (ug/m3) Quotient 3.6 0.4 3.3 0.3 2.5 0.3 9.7 1.0 7.8 0.8 7.7 0.8 6.7 0.7 270 28.3 160 16.3 39 4.0 COMPOUN D NAME Benzene Benzene Benzene Benzene Benzene Benzene Benzene Benzene Benzene Benzene 0.6 4.3 Benzene 1.0 Benzene 0.7 0.7 0.6 Benzene 5.0 Benzene Benzene Benzene Benzene CHRONIC MRL = 3ppb; INTERMEDIATE = 6 ppb; ACUTE = 9 365 days + 14-364 days 1-14 days ppb Ruido • EPA identifica un limite de exposición durante 24‐hour de70 decibeles para evitar la pérdida del oido durante la vida Quiet Room Whisper, Quiet Library at 6' Computer Refrigerator Typical Living Room Forced Hot Air Heating System Clothes Dryer dBA 28‐33 30 37‐45 40‐43 40 42‐52 56‐58 Printer Normal conversation at 3' Window Fan on High Alarm Clock Dishwasher Clothes Washer Phone Push Reel Mower Inside Car, Windows Closed, 30 MPH Handheld Electronic Games Kitchen Exhaust Fan, High Inside Car, Windows Open, 30 MPH Increased risk of cardiovascular disease – Increased risk of hypertension - dBA 58‐65 60‐65 60‐66 60‐80 63‐66 65‐70 66‐75 68‐72 68‐73 68‐76 69‐71 72‐76 66-70dBA 66-70dBA Garbage Disposal Air Popcorn Popper City Traffic (inside car) Jackhammer at 50' Snowmobile, Motorcycle 12 Gauge Shotgun Blast dBA 76‐83 78‐85 85 95 100 165 Niveles Máximos de Ruido Requeridos por by}} EPA en Camiones Que pesan más de 4,525 Kilogramos (40CFR202) Velocidad < 56 kph > 56 kph Estacionário Maximo Ruido a 15 Metros 83 dBA 87 dBA 85 dBA ACTIVIDAD A 625 PIES DEL POZO RUID0 PROMEDIO DE TODO EL PERIODO DE MUESTREO Vertical Hydraulic Donna Mills Wetzel 2 Fracturing/Flowback1 Drilling1 Mills Wetzel 3 Pad Preparation Hydraulic Maury Lemon Fracturing/Flowback2 Vertical Drilling2 Mean (dBA) Standard 46 57 68 53 54 Deviation 12 7 10 6 6 Fracturación Hidráulica/Flowback1 120.00 Ruido (dBA) 100.00 80.00 60.00 40.00 20.00 0.00 0 24 48 72 96 120 144 Tiempo (Horas) 168 192 216 240 264 Por hora Por minuto Hydraulic Fracturing Site A (near impoundment above pad) Site C (near road) Site D (1200 ft from pad) time above sound level (minutes) % of time above sound level sound level (DbA) time above sound level (minutes) % of time above sound level sound level (DbA) time above sound level (minutes) % of time above sound level sound level (DbA) 53 0.4 90 6 0.04 90 3 0.02 90 191 1.3 80 52 0.35 80 19 0.13 80 644 4.3 70 930 6.26 70 138 0.93 70 2277 15.3 60 4949 33.32 60 658 4.44 60 4261 28.7 50 11331 76.30 50 2760 18.63 50 7353 49.5 40 12048 81.13 40 10028 67.68 40 14845 100 30 14851 100.00 30 14817 100.00 30 Pad Construction time above sound level (minutes) 68 855 4046 7045 8416 8494 8494 % of time above sound level 0.80 10.07 47.63 82.94 99.08 100.00 100.00 Away from Construction (near road) sound level (DbA) 90 80 70 60 50 40 30 time above sound level (minutes) 1 7 242 3336 8202 8482 8494 % of time above sound level 0.01 0.08 2.85 39.27 96.56 99.86 100.00 sound level (DbA) 90 80 70 60 50 40 30 300 m Pozo Carretera Estratégia de Muestréo Sitios de Muestréo = ? ? ? ? ? ? ? ? [email protected] PM2.5 ≠ Dosis al pulmón 1.00 0.90 PM2.5 Muestra de Aire 0.80 DEPOSITO EN EL PULMON Eficiencia 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 0.01 0.10 1.00 Diameter (um) 10.00 100.00