GERENCIA DE SUPERVISION SENI REPORTE DIARIO DE GENERACIÒN * 17 DE JUNIO 2016 Orden Unidad Generaciòn Potencia 16/6/16 en Efectiva Hora Dem. (MW) Max. (MW) Demanda y Generaciòn Dem. Màx. Abastecida 16/6/16 1 AES Andres 281.3 300.0 2 Los Mina 5 118.0 - Demanda (MW) 3 Los Mina 6 118.0 - 4 Itabo 1 117.0 125.0 24.00 Horas Hora Dem. Max. Demanda No Abastecida (MW) 5 Itabo 2 110.0 130.0 EDENORTE 6 Barahona Carbon 7 Haina TG 8 Quisqueya 2 9 10 2,283.0 24 42.4 45.0 EDESUR 8 EDEESTE 44 Total 76 99.8 85.0 220.9 181.0 Sultana del Este 66.8 63.0 Haina 4 67.7 11 CEPP 1 16.2 9.0 12 CEPP 2 49.0 28.0 Renovable Hidroelectrica Disponibilidad en la hora de Dem. Màx. de 16/6/16 (MW) Termica 13 CESPM 1 CESPM 2 96.3 98.4 88.0 14 15 CESPM 3 99.6 88.0 16 La Vega 87.6 73.0 17 Palamara 102.5 100.0 18 Pimentel 1 30.8 26.0 19 Pimentel 2 27.5 22.0 Salida: 1/6/2016 20 Pimentel 3 50.4 37.0 Entrada: 10/7/2016 2,039.0 Total 22.0 264.0 2,325.0 Unidades Indisponibles CESPM 2 Causa: Mtto. Mayor. 21 Metaldom 40.7 40.0 LOS MINA V 22 Los Origenes 57.3 59.0 Causa: Mtto. Mayor. 23 Monte Rio 96.6 90.0 Salida: 4/6/2016 24 Quisqueya 1 215.0 129.0 Entrada: 24/6/2016 25 San Felipe 179.3 180.0 LOS MINA VI 26 Estrella del Mar 2 108.6 90.0 27 INCA KM22 14.2 9.0 Salida: 14/6/2016 28 Bersal 23.8 - 29 Rio San Juan Entrada: 18/6/2016 Evento Relevante en el SENI 30 Larimar** 30.0 8.0 85.3 14.0 1.7 31 Los Cocos/Q. Cabrera** 32 Mte Plata Solar** 30.0 33 Hidroelectricas** Totales 450.0 3,232.7 (*) Fuente: Organismo Coordinador. (**) Unidades que no definen costo marginal 264.0 2,283.0 Causa: Mtto. Mayor. LISTA DE MERITO Orden Unidad Tipo de Combustible 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 LOS MINA 6 LOS MINA 5 ITABO 2 ITABO 1 AES ANDRES ESTRELLA DEL MAR 2 CGN ESTRELLA DEL MAR 2 SGN BARAHONA CARBON QUISQUEYA 2 ESTRELLA DEL MAR 2 CFO SULTANA DEL ESTE ESTRELLA DEL MAR 2 SFO PIMENTEL 3 MONTE RIO PIMENTEL 1 CEPP 2 PIMENTEL 2 METALDOM PALAMARA LOS ORÍGENES POWER PLANT FUEL OIL CEPP 1 LA VEGA BERSAL INCA KM22 CESPM 1 CESPM 3 LOS ORÍGENES POWER PLANT GAS NATURAL CESPM 2 RIO SAN JUAN HAINA TG SAN FELIPE Gas Natural Gas Natural Carbón Carbón Gas Natural Gas Natural Gas Natural Carbón Fuel Oil #6 Fuel Oil #6 Fuel Oil #6 Fuel Oil #6 Fuel Oil #6 Fuel Oil #6 Fuel Oil #6 Fuel Oil #6 Fuel Oil #6 Fuel Oil #6 Fuel Oil #6 Fuel Oil #6 Fuel Oil #6 Fuel Oil #6 Fuel Oil #6 Fuel Oil #6 Fuel Oil #2 Fuel Oil #2 Gas Natural Fuel Oil #2 Fuel Oil #2 Fuel Oil #2 Fuel Oil #2,6 Capacidad Disponible (MW) Capacidad Disponible Acumulada (MW) 120.0 120.0 300.0 56.0 43.0 198.0 37.0 63.0 51.2 93.0 31.4 36.4 27.9 40.0 96.0 58.9 10.4 72.0 24.0 9.2 94.0 94.0 1.9 90.0 180.0 120.0 240.0 540.0 596.0 596.0 639.0 837.0 874.0 937.0 937.0 988.2 1,081.2 1,112.6 1,149.0 1,176.9 1,216.9 1,312.9 1,371.8 1,382.2 1,454.2 1,478.2 1,487.4 1,581.4 1,675.4 1,675.4 1,675.4 1,677.3 1,767.3 1,947.3 Costo Variable de Despacho (US$/MWH) 28 28 28 28 25 38 41 42 48 48 50 52 52 55 56 56 57 58 58 58 59 59 65 66 84 84 85 85 128 139 - - Mw Evolución de la Generación en 24 Hrs del 16 de junio 2016 2700 2450 2200 1950 1700 1450 1200 950 700 450 200 -50 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Horas Oferta Demanda No Servida